Projects

İstanbul Kayabaşı Emlak Konutları 1.Etap 3.Kısım Konut, Okul İle Adaiçi Altyapı ve Çevre Düzenlemesi İnşaatları İşi

Employer Emlak Konut Gayrimenkul Yatırım Ortaklığı A.Ş. - İSTANBUL
Contract Date 02.09.2013
Completion Date 12.11.2015
Construction Area 100.000 m²

 

Diyarbakır Altınpark Konutları İnşaatı

Employer  
Contract Date  
Completion Date  
Construction Area  

Hatay Merkez 750 Yataklı Devlet Hastanesi İle Altyapı ve Çevre Düzenlemesi İnşaatı

Employer T.C. Başbakanlık Toplu Konut İdaresi Başkanlığı -TOKİ
Contract Date 12.04.2012
Completion Date 06.11.2015
Construction Area 93.043 m²

Diyarbakır Üçkuyular 1024 Adet Konut ve 1 Adet Sosyal Tesis İnşaatı İle Adaiçi, Genel Altyapı ve Çevre Düzenlemesi İşi

Employer T.C. Başbakanlık Toplu Konut İdaresi Başkanlığı -TOKİ
Contract Date 22.06.2009
Completion Date 01.10.2014
Construction Area 65.967 m²

Ordu Giresun Havaalanı Üstyapı İnşaatı

Employer Ulaştırma Denizcilik ve Haberleşme Bakanlığı – ANKARA
Contract Date 18.02.2014
Completion Date 24.07.2015
Construction Area 62.594 m²

Eryaman 768 Housing Unit Construction - Ankara

Employer Housing Development Administration General Directorate ANKARA
Contract Date 04.06.2004
Completion Date 21.08.2005
Construction Area 103.495 m2

 

Central 2. District 498 Housing Units Construction - Bolu

Employer Public Works and Settlement Directorate ANKARA
Contract Date 16.06.2000
Completion Date 18.12.2000
Construction Area 64.754 m2

 

Ankara Police Forces Moral Training Center Construction - Ankara

Employer Security Forces General Directorate ANKARA
Contract Date 09.05.2001
Completion Date 18.08.2003
Construction Area 13.000 m2

Description of the Work: Reinforced concrete carcass, pre-tensioned – concrete, anchorages with bracing, curtain wall panels and facade coverings, 2 each 1250 kVA generator, 5 elevators, swimming pool, sauna, full furnishing, 1st class moral training center.

 

Aksaz Marine Base Command Facility Construction – Marmaris

Employer Ministry of Defense Property Directorate
Contract Date 25.12.1995
Completion Date 30.12.1998
Construction Area 240.000 m2

Description of the Work: Reinforced concrete carcass, concrete quay (Total 215 m), with 292 tons of steel piling, 1544 m3 concrete, 2 swimming pools of 1150m2 area, shore landscape, construction of 42201 meter of irrigation water system, helicopter landing area, day facilities, general landscaping, 3 Astroturf football fields, 9 basketball fields, 9 tennis courts, 8 volleyball fields, 85081 m2 field concrete and road, 2 children playing ground, 5148 m2 track sports field, application of topsprint and topflex in the basketball and volleyball fields as well as tennis courts, 3381 meters rain water drainage canal, 2 caisson well and a water tank with 500 tons of capacity. Main warehouse and operational material depot manufactured from prefabricated pre-tensioned concrete, 815 + 56, 1375 m2 movie theater, disco, village square, heating center, transformer, facility, gymnastic saloons, water tank with 1000 ton capacity, fire center, laundry buildings.

Marshall Cakmak Hospital Completion Construction - Erzurum

Employer Ministry of Defense Property Directorate
Contract Date 17.02.1999
Completion Date 23.06.2000
İnşaaat Alanı 65.000 m2

Description of the Work: 600 bed capacity, main hospital block, nurse dormitory, 26.676 m2 hospital building, command center, office, polyclinic, blood bank, emergency and first aid laboratories, operating room and clinic blocks, guard service squadron facilities 3041 m2 (enlisted living quarters, dining hall, service building) rest areas, 3 enclosed car lots, 2 stage building, main entrance to the site, heating center, heat channels, sewage system, 2 transformer buildings, temporary waste storage area and water tank.

 

Permanent Earthquake House Construction and Landscaping - Bingol

Employer Housing Development Administration General Directorate ANKARA
Contract Date 25.07.2003
Completion Date 15.04.2004
Construction Area 28.000 m2

 

Dicle University Education Faculty Construction - Diyarbakir

Employer Dicle University Chancery Building
Contract Date 27.11.1995
Completion Date 30.12.1998
Construction Area 26.000 m2

 

Uç Kuyular 484 Mass Housing Unit - Diyarbakir

Employer Housing Development Administration General Directorate ANKARA
Contract Date 04.10.2005
Completion Date 01.10.2006
Construction Area 65.000 m2


Police Dormitory Construction - Diyarbakir

Employer Ministry of Public Works and Settlement
Contract Date 03.03.1993
Completion Date 31.12.1997
Construction Area 40.000 m2


Diyarbakir Ergani 560 housing unit, social facilities (commercial center elementary school with 24 classes, mosque, water fountain). The first general infrastructure and landscaping construction - Diyarbakir

Employer Housing Development Administration General Directorate ANKARA
Contract Date 21.11.2005
Completion Date 27.12.2006
Construction Area 88.000 m2

 

Senirkent Akkeçili and Garip Villages Irrigation Pumping Stations- Isparta

Employer General Directorate of State Hydraulic Works, Directorate of District 18
Contract Date 28.08.2000
Completion Date 30.09.2005
   

 

Batman Kuyubaşı 606 Disaster House Construction

Employer Housing Development Administration General Directorate ANKARA
Contract Date 04.01.2007
Completion Date 04.11.2007
Construction Area 89.000 m2

 